For Engineers

Reserve study software for fast field-to-PDF reports

Mobile field capture, automated funding plans, and state-compliant templates, built for reserve study firms and engineering teams.

Book a demo
Dashboard interface showing performance metrics, quick action buttons, team workload with avatars and progress bars, and a map with team member locations.
5x faster

for your reserve study team, from field inspection to final PDF

-60% rework

across multi-state engineering and reserve study teams using standardized templates

100% compliant

with state-specific disclosures and reserve study calculations

Hand holding smartphone displaying cracked concrete surface, with app interface showing details for concrete parking repair including quantity and cost.
Field Mode

Capture on site.
It lands in the study.
No double-entry.

Field Mode captures geotagged photos with on-site notes, links them to the right component (or saves for later), cuts paper and transfers, ensures traceability, and speeds the handoff to funding and report.

apple Store download buttongoogle play download button
Field Mode
Core

Build a complete reserve study in just 4 steps.

Add project details and visit, assemble components with photos, compare funding plans, then drag sections to generate the final report-one flow, no spreadsheets.

White-label Reports
Enterprise

Your report format, exactly.

Remove PropFusion branding and deliver PDFs that mirror your current layout-migrated by our team in 3-4 weeks.

Component Templates
Core

Build your own component library.

Create reusable templates with your default UL, RUL, unit, and cost fields (per state) - then drop them into projects for 5x faster assembly. Import your existing list via CSV; adjust anything per project.

Funding Plans
Core

Funding plans for every state and every workflow.

Pick preset plans for guardrailed speed, build custom targets when you need control, or allocate by component method - then compare and publish.

Preset funding plans

  • Full Funding - Stay at/above fully funded each year.
  • Baseline - Keep the balance positive with minimums.
  • Threshold - Never drop below a floor you set.

Custom funding plans

  • Target - Hit a specific balance or % by a year.
  • Threshold (custom) - Define the yearly floor.
  • Custom - Control yearly contributions and rates.

Component method

  • Sequential - Fund one component at a time by RUL.
  • Cyclic Percentage - Distribute in repeating %
  • Pro Rata - Allocate proportional to total need.
Lead Generator
Core

Reserve study inquiries. Sent to your inbox.

We receive 300+ HOA requests nationwide and forward the right ones based on your selected states. These come from HOAs & COAs of different sizes for SIRS and all 3 levels of reserve studies.

Portfolio Intelligence
Enterprise

Plan replacements, not just reports.

Turns reserve data into an actionable schedule of component jobs for engineering teams - ready for prioritization and bundling.

One-click Updates
Core

Update last year's study to today, in one click.

Choose a mode-Basic, Lifespan, Price, or Full - and PropFusion recalculates plans instantly. You can review deltas and fine-tune before publishing.

Team Activity
Pro

Know who changed what, and when.

Searchable activity feed, diffs, and role-based visibility. Admin and Manager roles keep control simple.

Dashboard
Pro

Your week, month, and year, organized in a single view.

See starts, completions, site visits, and workload.
Plan assignments and schedule visits in one place.

Replacement Schedule
Core

Skip years without splitting components.

Use "hopover" to pause replacements for specific years.
Calculations and funding adjust automatically.

Procurement Center
Enterprise

Bulk bids without spreadsheets.

We auto-group upcoming replacements across your portfolio and assemble ready-to-send RFP packets-export to PDF in one click.

Built for professional standards

Enterprise security and reliability without the complexity.

Data Integrity

Full audit trails.

Security

Encrypted at rest and in transit. Role-based access.

Reliability

Automated backups and exports.

Support

Dedicated onboarding. Migration assistance included.

Testimonials

Trusted by reserve study teams of all sizes

PropFusion is a game changer! We handle twice the volume without adding headcount.

John Brown, RS
Reserve Specialist

It's fast! I’ve gone from thinking in weeks and days to thinking in hours and minutes.

Ryan Fuller
Reserve Specialist at ReserveWise

Frequently asked questions

What exactly is the Reserve Builder workflow?

The iOS/Android app captures geotagged photos and on-site notes and links them to the right component (or your photo gallery for later allocation). Everything lands in the study—no double entry.

How does Field Mode save time in the field?

A simple flow: project details & visit scheduling → choose RS level/SIRS → add or tweak components → auto-generate funding plans → publish/download reports.

Is Portfolio Intelligence the same as the dashboard?

No. The dashboard shows project/visit status; Portfolio Intelligence (Enterprise) rolls up upcoming component projects across communities, grouped by location, date, or category to spot bundling opportunities—built for engineering teams that execute the work.

Do you provide a master library of components and costs?

We don’t ship defaults. Create your own Component Templates (UL, RUL, cost, even per-state pricing rules) or import them via CSV; they auto-populate during report assembly.

How flexible are Funding Plans?

Choose preset plans (Full, Baseline, Threshold), custom plans (Target, your own Threshold, fully Custom), or use Component Method strategies (Sequential, Cyclic %, Pro Rata, optional Underfunding Shift). Some modes are fully editable; others are auto-produced with guardrails for accuracy.

What does One-click Update change?

Update past studies in one action: Basic (project year), Lifespan (RUL), Price (costs), or Full (lifespans + prices). New plans are calculated automatically and remain editable.

Can we replicate our existing PDF report format?

Yes—White-label Reports (Enterprise). We remove PropFusion branding and can replicate your current PDF layout; our team completes the migration in 3–4 weeks post-signup (one-off fee).

How do Procurement Automation and Bulk RFPs work?

Enterprise identifies bundle opportunities, groups similar upcoming projects, and assembles structured RFP files (category/time/location).

Do you provide leads? How are they routed?

Yes. The Lead Generator forwards ~300–500 HOA inquiries/year from across the U.S., routed by the states you choose—helping firms scale without extra marketing spend.

Your Reserve Fund Shouldn't Be a Guessing Game

Get a professional reserve study from a team that's done it over 4,000 times - and a platform that makes sure your board actually uses it.

Book a demo