HOA RESERVE STUDY
>
How Much Does an HOA Reserve Study Cost?

How Much Does an HOA Reserve Study Cost?

September 14, 2025
-
Andrew Smith
Request multiple reserve study proposals for free

PropFusion connects you with a vetted network of Reserve Study experts in your state, ensuring best industry standards.

Request Proposals Today

When boards start talking about reserve studies, the first practical question is usually simple:

How much is this going to cost us?

There is no single flat fee. Different sources put the cost of an HOA or condo reserve study anywhere from a few hundred dollars up to ten or fifteen thousand dollars depending on size, complexity and scope.

A good rule of thumb from several reserve specialists is that a full baseline study often lands around or under 1 percent of the association’s annual budget, with updates costing less. (Association Reserves)

This guide explains what drives those numbers so your board can sanity check quotes and budget realistically. If you need a broader introduction to how reserve studies work, see HOA Reserve Study Guide.

Typical Cost Ranges For HOA Reserve Studies

Actual pricing is always project specific, but national providers and management companies describe similar bands:

  • Some management and reserve firms note that reserve studies for typical associations often fall between 2,000 and 7,000 dollars, with a wider range of 2,000 to 10,000 dollars for larger or more complex communities. (CMA | Community Management Associates)
  • Legal and industry publications frequently cite 1,500 to 5,000 dollars for many HOAs, again depending heavily on size and amenities. (Mulcahy Law Firm)
  • In markets with special requirements, such as Florida’s Structural Integrity Reserve Studies, engineering firms report ranges of 1,500 to 10,000 dollars for standard reserve studies and 5,000 to 15,000 dollars or more for SIRS work on large condo buildings. (fpat.com)

On the low end, small communities ordering a desktop update without a site visit can sometimes pay under 1,000 dollars. On the high end, large master associations and complex high rises can easily justify fees in the five figures.

If a quote is far below or above these ballparks, it is worth asking detailed questions about scope.

What Drives The Cost Of A Reserve Study?

Most reserve study firms point to the same core drivers.

1. Size and number of components

The bigger your community, the more time it takes to inventory components, check conditions and model costs. Providers mention unit count, number of buildings and site acreage as key inputs when pricing a study.

A 40 unit townhome community with a few shared elements will cost less to study than a 300 unit condo with multiple buildings, elevators and extensive amenities.

2. Complexity and amenities

Even if two associations have similar unit counts, one may have:

  • Multiple roofs and wall systems
  • Elevators and mechanical systems
  • Pools, clubhouses, parking structures or marinas

The more complex the physical plant, the more inspection and modeling effort is required. Several firms explicitly list complexity and amenities as separate factors from simple size.

3. Level of service

CAI’s reserve study standards describe different levels of service, from a full baseline study with site visit to updates with site visit and updates without site visit.

Cost typically follows this pattern:

  • Full baseline study – highest fee
  • Update with site visit – roughly half to three quarters of the cost of a full study
  • Update without site visit – often under 1,000 dollars for many communities

If you see a surprisingly cheap quote, confirm whether it is a true baseline study or just a desktop refresh of existing numbers.

4. Location and travel

Travel time, local labor rates and regional conditions matter. Guides from Florida and other states explicitly note that coastal and high risk areas can see higher fees, especially where engineers must consider additional structural and environmental factors.

Large national providers will sometimes adjust pricing based on how far a specialist must travel to reach your site.

5. Provider qualifications and scope

Hiring a firm that follows CAI National Reserve Study Standards and APRA Standards of Practice is not free, but it usually pays off in quality and lender confidence. (CAI)

You can expect to pay more when:

  • You request multiple funding scenarios and meetings
  • The provider includes present value or inflation modeling beyond the basic requirements
  • You ask for a short turnaround or work in peak season

On the other hand, if a quote is far below market and comes from someone who does not appear in CAI or APRA directories, that is a red flag.

How Often Will You Pay For Reserve Study Updates?

The cost question is not a one time issue. Boards need to think about total cost of ownership over the life of the community.

Most best practice guidance suggests:

  • A full baseline study when the community is new or when you first engage a professional
  • Periodic updates with site visits every few years
  • Desktop updates in between to keep numbers fresh

Since updates cost significantly less than a full study, the long term cost of maintaining a good plan is usually modest compared to the scale of the capital projects involved.

How To Budget And Evaluate Quotes

When your board starts budgeting for a reserve study, it helps to:

  1. Use your operating budget as a rough benchmark. Industry sources place a full study at somewhere under 1 percent of annual budget for many communities.
  2. Request proposals from multiple firms that work under CAI and APRA standards.
  3. Make sure each proposal specifies the level of service, whether a site visit is included, the length of the projection period and what scenarios will be modeled.
  4. Look beyond price. A slightly higher fee from a well qualified firm is usually cheaper than a weak study that has to be redone.

Bringing It All Together

For most associations, an HOA reserve study is a four to five figure line item that prevents six or seven figure surprises. Small HOAs might pay between 1,500 and 4,000 dollars for a full study, mid sized communities often land between 2,000 and 7,500 dollars, and large or highly complex properties can see fees approaching 10,000 dollars or more, particularly when structural work is involved. 

Frequently Asked Questions

How often should a reserve study be conducted?

It's important to have a comprehensive reserve study done every 3-5 years, with annual or bi-annual updates. State laws may also dictate the frequency (e.g., every 3 years in California). Read through our state law guide for more information.

Can I perform a reserve study myself?

While it's possible for board members or the HOA manager to conduct a reserve study, it's generally recommended to hire a professional analyst or provider. They have the expertise and experience to accurately determine replacement costs, project life cycles, and funding plans.

How do I choose a reputable provider?

Look for providers with industry certifications, extensive experience in your area, and a proven track record of conducting thorough reserve studies for similar communities or associations. Request references and compare pricing from multiple providers.

Request multiple reserve study proposals for free

PropFusion connects you with a vetted network of Reserve Study experts in your state, ensuring best industry standards.

Request Proposals Today

Take the guesswork out of choosing a reserve study company

PropFusion connects you with a vetted network of Reserve Study experts in your state, ensuring best industry standards.

Request free proposals